Business Portfolio

Business Portfolio

Friday, December 7, 2018

Minda Corporation - Case Study


Design reuse:
Initiative:
Manage the entire design data in a centralized repository with complete control on data security
Result:
Increased design reuse, reduced errors and cut design cycle time

Design collaboration:
Initiative:
Having the same drawing version at all point of use for manufacturing, purchasing and etc. Eliminating paper drawings submission for design review
Result:
Design collaboration within engineering team and extended team is easy and eliminated manual intimation.

Improve Design Re-use:
Initiative:
Re-use old project designs for new projects
Result:
Sharing data between design & manufacturing departments , Other plant, and vendors was made easier by using PTC Windchill

Automate Design release process:
Initiative:
All designs need to be released through auto routing process and system driven.
Result:
Re-works due to referring wrong drawing version was completely eliminated. Entire design & related data in one location for easy search & retrieval

No comments:

Post a Comment